1. Improve the plant, increase of equipment reliability
- To ensure safe working conditions are designed and standardised into any changes in working practices, new machines and equipment
- To monitor and improve PLC automation and controls to ensure smooth plant operations with minimum breakdowns attributable to electrical, automation and control reasons
- To monitor and improve WINCC SCADA system to ensure manufacturing team can control manufacturing process with the highest accuracy
- To provide detailed problem analysis for engineering solutions to maintenance problems in conjunction with production management and operators
2. Co-codinate with other department to works together and ensure achieve target
- To create detailed, descriptive plant shutdown schedules, which secure the total ongoing support and contribution of the plant management team
- To support the manufacturing team in the review of successful performance and countermeasures
- To develop and implement energy management systems leading to reductions in operations cost
- To support the maintenance team in problem analysis, countermeasure and preventive breakdown
3. Upgrade equipment and system
- To find abnormalities in equipment or system to fix
- To find weakness of design to improve the equipment and system.
4. WCM progamme
- To apply WCM basic tool solve problem and lead PM or FI project
5. Safety
- Promote and manage a safe working environment that results in attaining the group target of ZERO accidents. Specifically, to ensure that safe working conditions are designed and standardized into any changes in working practices
- Do the SMAT, OSA, EMAT every month
- To do risk reduction project to improve plant risk score